LEAN MANUFACTURING APPROACH USING COST INTEGRATED VALUE STREAM MAPPING TO REDUCE WASTE IN FAKE EYELASHES PRODUCTION FLOOR
Abstract
Fake eyelashes are made in Indonesia by a variety of industries. There are issues within the company that have an impact on the output. Waste issues in the manufacture of fake eyelashes are the cause of inconsistent production output, such as flaws in the goods, waiting times, and improper processing. A lean manufacturing approach is required to find a solution to the issues that PT. X is experiencing as a result of the data model. The Value Stream Mapping (VSM) method, the Activity Based Costing (ABC) method integration, the Value Stream Analysis Tools (VALSAT) method calculation, the Root Cause Analysis (RCA) method, and then gives recommendations for improvement. The use of continuous flow, task combinations, and the delivery of raw materials once each week are all suggested improvements. When current cost integrated value stream mapping is compared to future cost integrated value stream mapping, the production lead time drops from 0.5 days to 0.36 days, the total value-added cost drops from 2.049 to 1.561, the total non-value-added cost drops from 12.754 to 11.243, and the travel distance drops from 99 meters to 79 meters.
Keywords
Full Text:
PDFReferences
Abuthakeer, S. S., Mohanram, P. V, & Kumar, G. M. (2010). Activity Based Costing Value Stream Mapping S. International Journal Of Lean Thinking, 1(2), 14.
Antandito, D. J. Pendekatan Lean Manufacturing Pada Proses Produksi Furniture Dengan Metode Cost Integrated Value Stream Mapping ( Studi Kasus : Pt . Gatra Mapan, Ngijo, Malang ) Lean Manufacturing Approach In Furniture Production ( A Case Study In Pt . Gatra Mapan, Ng. 2014, 2(6).
Ari Zaqi Faritsy, S. (2015). Peningkatan Produktivitas Perusahaan Dengan Mneggunakan Metode Six Sigma, Lean Dan Kaizen. Jurnal Teknik Industri, 10, 6.
Chuang, X., Li, L., Zhu, L. et al. The design of a real-time monitoring and intelligent optimization data analysis framework for power plant production systems by 5G networks. Energy Inform 8, 29. 2025. https://doi.org/10.1186/s42162-025-00487-8
E Oliveira, E., Miguéis, V.L. & Borges, J.L. Automatic root cause analysis in manufacturing: an overview & conceptualization. J Intell Manuf (2022). https://doi.org/10.1007/s10845-022-01914-3.
Fadhilah Al K, E. P. Aplikasi Kaizen Pada Brake Assembly Line Untuk Meningkatkan Produktivitas Line ( Studi Kasus : Pt . Xyz ). Seminar Nasional Teknik Industri Universitas Gadjah Mada, November, 100–110. 2017.
Farook A. S, Srikanta .R, Maitri Thakur, A. simulation-based performance investigation of downstream operations in the Indian Surimi Supply Chain using environmental value stream mapping, Journal of Cleaner Production, Volume 286, 2021, 125389, ISSN 0959-6526, https://doi.org/10.1016/j.jclepro.2020.125389.
Gaspersz, Vhine. Lean Six Sigma For Manufacturing And Service Industries. Jakarta : Pt. Gramedia Pustaka Utama. 2007.
Helleno, A.L., Pimentel, C.A., Ferro, R. et al. Integrating value stream mapping and discrete events simulation as decision making tools in operation management. Int J Adv Manuf Technol 80, 1059–1066 (2015). https://doi.org/10.1007/s00170-015-7087-1.
Henny, Henny., H R Budiman 2018 IOP Conf. Ser.: Mater. Sci. Eng. 407 012077.
Hines, P., & Taylor, D. (2018). Going lean. Australian Journal of Pharmacy, 95(1124), 42–46.
Kang‐Bo Feng, Yuan‐Yuan Zhu, Shuang‐Xi Gu, Jiao Long, Hai‐Feng Wang, Typical Cases of Continuous Flow Chemistry in Pharmaceutical Synthesis in 2023–2024, Asian Journal of Organic Chemistry, 2025,
e202500132,
https://doi.org/10.1002/ajoc.202500132
Lusia, Permata, S . H. Work Measurement Approach To Determine Standard Time In Assembly Line. International Journal of Management and Applied Science. 2 (10). Pp 192 – 195. 2016.
Mahapatra, A.S.; Soni, H.N.; Mahapatra, M.S.; Sarkar, B.; Majumder, S. A Continuous Review Production-Inventory System with a Variable Preparation Time in a Fuzzy Random Environment. Mathematics 2021, 9, 747.https://doi.org/ 10.3390/math9070747.
Morato, M.L.d.S. and Ferreira, K.A. "Value stream mapping application for construction industry loss and waste reduction: a systematic literature review", International Journal of Lean Six Sigma, Vol. 15 No. 4, pp. 817-837. 2024. Fhttps://doi.org/10.1108/IJLSS-06-2023-0100
Moses, L.S., Yasmin, N.G, Siens. H. Cost integrated value stream to optimize production cost of high-frequency welding steel pipe. AIP Confrence Procidings. PROCEEDINGS OF THE 2ND INTERNATIONAL CONFERENCE ON AUTOMOTIVE, MANUFACTURING, AND MECHANICAL ENGINEERING (IC-AMME 2021): Enhancing Sustainability and Value-Added Creation in Smart Industries. 2024. Doi : https://doi.org/10.1063/5.0192160
Padhil, A., Purnomo, H., Widodo, I.D., Suryaprantha, D., Nurwildani, M.F. (2024). Safety preventive protection in micro and small-and medium-sized enterprises sector: A systematic literature review. In 2024 ASU International Conference in Emerging Technologies for Sustainability and Intelligent Systems (ICETSIS), Manama, Bahrain, pp. 751-758. https://doi.org/10.1109/ICETSIS61505.2024.10459472
Pandya, H. B., Shah, S. I. Lean Manufacturing Implementation Using Value Stream Mapping In An Automotive Industry. International Journal Of Advance Engineering And Research Development, 2(05), 812–822. 2017.
Rahman, I., Akbar, F (2013). Design Of Lean Production System Using. International Seminar On Industrial Engineering And Management, 6–11.
Raju, G.S., Vizhian, S.P., Kumar, M.V. et al. Optimization of job scheduling for flexible manufacturing systems using ANOVA technique and artificial neural networks. Int J Interact Des Manuf 19, 1883–1893 (2025). https://doi.org/10.1007/s12008-024-01870-7
Rich, P. H. And N. (1997). The Seven Value Stream Mapping Tools. Applied Mechanics And Materials, 26(1), 553–564.
Ristyowati, T., Muhsin, A., & Nurani, P. P. Minimasi Waste Pada Aktivitas Proses Produksi Dengan Konsep Lean Manufacturing (Studi Kasus Di Pt. Sport Glove Indonesia). Opsi, 10(1), 85. 2017.
Sri Indrawati, Alfina Budi Khoirani, Riadho Clara Shinta. (2018). Model Development of Lean Action Plan Selection to Reduce Production Waste in Batik Industry. 2018 4th International Conference on Science and Technology (ICST), 1(Cm), 1–5.
Sudhakar, N., Vishnuvardhan, K., and Babu, K. T. Value stream mapping in construction for improving productivity. International Journal of Scientific Research in Civil Engineering, 2(1), 5-8. 2017.
Summer, C.R. (1998). The Rise Of Activity Based Costing. Part One: What Is An Activity Based Cost System?”. Journal Of Cost Management : 45-54
Taylan, T., Gul Polat., Harun Turgoklu. Analysis of Industrial Formwork Systems Supply Chain Using Value Stream Mapping. Journal of Engineering, Project, dan Production Management. 12 (1). 47-61. 2022.
Thakur, A. S., Patel, S., & Patel, V. (2020). Waste Assessment In An Indian Casting Industry : A Step Towards Lean Manufacturing. International Journal Of Innovative Technology And Exploring Engineering (Ijitee), 3, 1861–1866.
Refbacks
- There are currently no refbacks.