OPTIMIZATION OF PUMP MAINTENANCE TIME IN THE STEAM SYSTEM AREA PT XYZ USING A RELIABILITY AND MAINTENANCE VALUE STREAM MAPPING APPROACH

Deden Yuda Pratama, Mochamad Sulaiman, Christopher Davito Prabandewa Hertadi

Abstract

The pumps in Steam System PT XYZ frequently fail, resulting in a cumulative downtime of 15000 hours and potentially affecting output. The goal of this study is to examine the problem by 1) knowing the pump reliability, 2) evaluating the pump maintenance system using MVSM, and 3) offering recommendations based on the reliability and MVSM results in the Steam System Area of PT XYZ. The reliability values of pumps G04-III-A, G04-I-S, G04-I-A, G07-A, and G02-S were calculated as 52,20%, 45,59%, 50,19%, 47,09%, and 43,15%, respectively. The maintenance system was then evaluated using MVSM, yielding a Current State Map with a maintenance efficiency of 51%, a VA activity time of 8927 minutes, and an NVA activity time of 9672 minutes. The Future State Diagram The advice resulted in a 99% gain in maintenance efficiency, and NVA activity time was reduced by 9600 minutes. Maintenance time intervals on pumps G02-S, G04-I-A, G04-III-A, G04-I-S, and G07-A are recommended every 49 days, 31 days, 44 days, 35 days, and 76 days, respectively, while recommendations with the MVSM approach are in the form of eliminating the time delay that occurs when the material is not available, which is done by estimating the time the material is needed and the previous purchase time. This study concludes that by following the recommendations, the pump maintenance system in the Steam System Area of PT XYZ may be optimized.

Keywords

Downtime, Maintenance, MVSM, Pump, Reliability

Full Text:

PDF

References

Damanik, G.M., Soekarno, S. and Suryaningrat, I.B. (2020), “Perancangan Sistem Perawatan Komponen V-Belt Pada Sistem Transmisi Dengan Metode RCM Dan MVSM (Studi Kasus PT Perkebunan Sentool Zidam V/Brawijaya Jember)”, Jurnal Teknik Pertanian Lampung, Vol. 9 No. 4, pp. 287–296, doi: 10.23960/jtep-l.v9.i4.287-296.

Darusman, I. (2017), “Usulan Waktu Perawatan Bus Berdasarkan Kendalan Suku Cadang Kritis Di PT. Suryaputra Adirpradana”, UNIKOM Repository.

Dhillon, B.S. (2002), Engineering Maintenance : A Modern Approach, CRC Press, Boca Raton.

Ebeling, C.E. (1997), An Introduction to Reliability and Maintainability Engineering, edited by Munson, E.M. and Morriss, J.M., British Library Document Supply Centre, West Yorkshire.

Gaspersz, V. (2002), Total Quality Management, PT Gramedia Pustaka Utama, Jakarta.

Huda, A.T.N., Novareza, O. and Andriani, D.P. (2015), “Analisis Aktivitas Perawatan Mesin Hds Di Stasiun Gilingan Menggunakan Maintenance Value Stream Map (Mvsm) (Studi Kasus Pg. Kebon Agung Malang)”, Jurnal Rekayasa Dan Manajemen Sistem Industri, Vol. 3 No. 2.

Lukodono, R.P., Pratikto and Soenoko, R. (2013), “Analisis Penerapan Metode RCM Dan MVSM Untuk Meningkatkan Keandalan Pada Sistem Maintenance (Studi Kasus PG. X) Mahasiswa Jurusan Teknik Mesin Program Magister Fakultas Teknik UB 1)”, Jurnal Rekayasa Mesin, Malang, Vol. 4 No. 1, pp. 43–52.

Nainggolan, E. (2017), “Penerapan Metode Reliability Centered Maintenance Menggunakan Software SPSS pada Sistem Pendingin Generator Mitsubishi Kapasitas 62500 kVA”, Repositori Institusi Universitas Sumatera Utara.

Nasution, M.N. (2005), Manajemen Mutu Terpadu (Total Quality Management), PT Gramedia Pustaka Utama, Jakarta.

Ngadiyono, Y. (2013), Pemeliharaan Mekanik Industri, 1st ed., Deepublish, Yogyakarta.

Nursanti, E., Avief, S., Sibut and Kertaningtyas, M. (2019), Maintenance Capacity Planning: Efisiensi & Produktivitas, Dream Litera Buana, Malang.

Oktalisa, P., Matondang, N. and Ishak, A. (2013), “Perancangan Sistem Perawatan Mesin Dengan Pendekatan Reliability Engineering Dan Maintenance Value Stream Mapping (MVSM) Pada PT XXX”, Jurnal Teknik Industri FT USU, Vol. 3 No. 1, pp. 52–56.

Pranowo, I.D. (2019), Sistem Dan Manajemen Pemeliharaan (Maintenance: System and Management), 1st ed., Deepublish, Yogyakarta.

Purba, S., Parinduri, L. and Harahap, B. (2021), “Penentuan Interval Waktu Preventif Maintenance pada Mesin Open Top Roller Menggunakan Metode Reliability Centered Maintenance di Unit Pabrik Teh Kebun Tobasari PT. Perkebunan Nusantara IV”, Cetak) Buletin Utama Teknik, Online, Vol. 16 No. 2, pp. 1410–4520.

Ramadhan, M.A.Z. and Sukmono, T. (2018), “Penentuan Interval Waktu Preventive Maintenance Pada Nail Making Machine Dengan Menggunakan Metode Reliability Centered Maintenance (RCM) II”, PROZIMA (Productivity, Optimization and Manufacturing System Engineering), Universitas Muhammadiyah Sidoarjo, Vol. 2 No. 2, pp. 49–57, doi: 10.21070/prozima.v2i2.1349.

Rambuna, O. (2019), “Penerapan Metode Reliability Centered Maintenance (RCM) pada Mesin Produksi Obat-Obatan [XYZ]”, Jurnal Valtech, Malang, Vol. 2 No. 2, pp. 117–123.

Sari, N.S. (2017), PERENCANAAN ULANG INSTALASI POMPA AIR BERSIH PADA GEDUNG PUSAT RISET ITS SURABAYA, Surabaya.

Sugiyono. (2016), Metode Penelitian Kuantitatif, Kualitatif Dan R&D, PT Alfabet, Bandung.

Taufik dan Septyani, S. (2015), “Penentuan Interval Waktu Perawatan Komponen Kritis pada Mesin Turbin di PT PLN (Persero) Sektor Pembangkit Ombilin”, Jurnal Optimasi Sistem Industri, Vol. 14 No. 2, pp. 238–258.

Refbacks

  • There are currently no refbacks.