RE-SCHEDULING OF THE CRUDE OIL STORAGE TANK MSTB T-701D PROJECT USING THE CRITICAL PATH METHOD (CPM) AND CRITICAL CHAIN PROJECT MANAGEMENT (CCPM)

Dinda Syafa Rachmanur Firdaus, Farida Pulansari

Abstract

In the MSTB T-701D Crude Oil Storage Tank project, good scheduling is needed so that the project can run smoothly during the process. The most frequently used methods in designing project scheduling are the Critical Path Method and the Critical Chain Project Management. This study aims to compare scheduling results between the traditional CPM and the CCPM methods. The project used in this research analysis is the Crude Oil Storage Tank MSTB T-701D project. The Root Square Error Method (RSEM) is used to find the buffer size. In the scheduling analysis, calculations are carried out manually and with the help of Primavera P6 software as validation for calculating the total float, critical path, and project network. Project scheduling using the Critical Path Method (CPM) is known to be completed in 164 days. Whereas for the CCPM, the project can be completed in 140.1 days plus the RSEM buffer calculation method of 5.29 days, and the total scheduling with CCPM produces 145.3 days. This analysis shows that the traditional CPM method has a larger estimated duration than CCPM with an RSEM sizing buffer. Then a suggestion was made to work on the MSTB T-701D Crude Oil Storage Tank project using the CCPM and RCA methods.

Keywords

Critical Path Method, Critical Chain Project Management, Root Cause Analysis

Full Text:

PDF

References

Haryoko, B.F. et al. (2022) ‘Survei Metode Pengembangan Jadwal Menggunakan Metode Semantic Literature Review’, ILKOMNIKA: Journal of Computer Science and Applied Informatics E, 4(3), pp. 335–345. Available at: https://doi.org/10.28926/ilkomnika.v4i3.385.

Hasil, J. et al. (2023) ‘Optimalisasi Repair Schedule Dengan Metode Critical Chain Project Management Guna Mempercepat Pengerjaan Repair Pada KM Srikandi Line 767 DWT’, Jurnal Teknik Perkapalan, 11(1). Available at: https://ejournal3.undip.ac.id/index.php/naval.

Hidayah, R., Ridwan, A. and Cahyo, Y.S. (2018) ‘ANALISA PERBANDINGAN MANAJEMEN WAKTU ANTARA PERENCANAAN DAN PELAKSANAAN’, JURMATEKS, 1(2).

Priyanto, E., Ervadius, B. and Wahyudi, M.A. (2019) ‘PERCEPATAN WAKTU DAN BIAYA TERHADAP PERENCANAAN PROYEK FABRIKASI STEAM TURBIN BUILDING BLOK 2 MUARA TAWAR DENGAN METODE CPM’, Jurnal Keilmuan dan Terapan Teknik, 8(2).

Putri, M.P. and Bobby, B. (2020) ‘Sistem Informasi Manajemen Proyek PT. Samudera Perkasa Konstruksi Berbasis Web’, MATRIK : Jurnal Manajemen, Teknik Informatika dan Rekayasa Komputer, 20(1), pp. 85–96. Available at: https://doi.org/10.30812/matrik.v20i1.716.

Rahayu, S. and Eliyah Yuliana, P. (2022) ‘PENERAPAN METODE CPM DAN CCPM UNTUK PERENCANAAN SUMBER DAYA DAN WAKTU PENYELESAIAN MULTI PROYEK’, JISO: Journal Of Industrial And Systems Optimization, 5(2), pp. 92–98.

Rio, W.Y. and Herawati, E. (2022) ‘Penerapan Critical Path Method di Perumahan Gunung Empat Balikpapan’, JURNAL TEKNIK SIPI, 7(3).

Shadiq, F. (2020) ‘ANALISIS TIME COST TRADE OFF PADA KETERLAMBATAN PEKERJAAN PROYEK PEMBANGUNAN MASJID AL FAJAR KOMPLEK PESANTREN AL FAJAR KEL. AIR HITAM KEC. SAMARINDA ULU’, Jurnal Ilmu Pengetahuan dan teknologi sipil, 11(1).

Sugiyanto, S. and Insan, K. (2022) ‘PENEREPAN OPTIMALISASI METODE CRITICAL CHAIN PROJECT MANAGEMENT PADA PELAKSANAAN PROYEK KONTRUKSI’, Rang Teknik Journal, 5(2), pp. 352–363. Available at: https://doi.org/10.31869/rtj.v5i2.3121.

Utamadan, W. and Syairudin, B. (2020) ‘Perencanaan dan Pengendalian Proyek Konstruksi dengan Metode Critical Chain Project Management dan Root Cause Analysis (Studi Kasus: Proyek Pengadaan Material dan Jasa Konstruksi GI 150 kV Arjasa)’, JURNAL TEKNIK ITS V, 9(2), pp. 2301–9271.

Waluyo, M. and Pulansari, F. (2014) ‘Penentuan Jumlah Optimal Line Pengiriman Secondary Raw Material Di Lantai Produksi (Studi Kasus PT. X,tbk)’, Jurnal Tekmapro [Preprint], (11).

Refbacks

  • There are currently no refbacks.